

| Power | 300 MW |
| Capacity | 716 MWh brutto (DC) |
| Start of building | 2025 |
At the end of 2024, ECO STOR, together with energy transition associations and the Federal Council, successfully campaigned for a change in trade tax law. Until then, local authorities had not been taken into account when it came to paying trade tax on energy storage facilities. In the meantime, trade tax law has been amended for the 2025 tax year so that 90% of the trade tax levied on energy storage facilities is paid directly to the local communities. With this regulation, the municipalities at the plant location receive the same financial participation as has already been provided for wind and PV plants since 2021. As a result, in addition to the advantages for security of supply and climate protection, the municipalities now also benefit directly and significantly from the trade tax revenues of the storage facilities. Translated with DeepL.com (free version)

We at ECO STOR GmbH check a variety of criteria to find the best possible location for the large-scale battery storage system. The basis is the immediate proximity to a 110 kV grid connection. However, it is also particularly important to us that the site is far enough away from residential areas to minimise noise pollution and that it is compatible with species and nature conservation.

The large-scale battery storage facility is being built in Förderstedt, a district of Staßfurt.
Address:
Makrene 8
39443 Staßfurt-Förderstedt

We need more wind power and photovoltaics in Germany for more climate protection and the energy transition. However, as they only feed electricity into the grid when there is enough wind or sun, they also pose a challenge for the German electricity system. This can be remedied by battery storage systems, which help to integrate more renewable energies into the German electricity system in a stable manner and thus accelerate the energy transition.
We at ECO STOR also want to make a concrete contribution to protecting the environment during the construction of the battery storage systems. When fencing the facility, for example, we ensure that there is a sufficiently large gap to the ground to allow wild animals to pass through. In addition, we create a habitat for numerous animals by completely planting the site boundaries with native shrubs and trees.

Do you have any questions about the project?
Then simply send us an email to:
foerderstedt@eco-stor.de